I AM TOO OLD FOR THIS SHIT….
We bought a new refrigerator,
which is suppose to be delivered on Thursday…
We decided to move the old one out to the garage as an extra one for
summer pop and etc.. and Thanksgiving dinner making extra space.
So we got up bright an
early yesterday to do just that.
I guess it was wearing on me,
more than I thought, as I woke at 4am…and couldn’t go to sleep. So I got up..
Usually I get up at 7am.
At about 7am, we got started.
Took stuff off of the top the night before.. But had some totes that I put the
food in and cooler for the freezer stuff.
Dragged them around the corner in the kitchen to give us room to remove
the refrigerator. All that went fairly
well.
We had to take the refrig out
the door (luckily we have double doors) and across the deck and then the tricky
part of down the 3 steps to the walk way, thru the gate and into the garage.
Sounded simple enough. My job was to keep the refrig and dolly going down each
step slowly and not take off. That went
well, Then the King decided while in the laying position, it would be good to
vacuum the back and bottom. Then it was time to raise the dolly and refrig. Not
quite as easy as it sounds. Did manage
to raise it as I keep it from taking off… and thru the gate it went and into
the garage, get it position into the area we wanted. Plug in.
Then it was clean up time.. 5
years of sitting in one place. But to our horror we discovered that the cabinet
next to it had rot in the base. So that open a whole new ball game.
Removing stuff from the top
of the cabinet… coffee maker, microwave and etc. Remove all the stuff inside of the cabinet…
pans, rolls of wax paper, alumimum and cling wrap… lots of them. Boxes and
boxes of them.
Then unscrew the cabinet from
the wall.. and out to the deck. The King
cut and replace a base to it, while I washed parts to the refrig. And then put it all back in and replace all of
the food in the freezer and etc. About a
2 hour project.
The King got the base done,
while I scrubbed the floor where the refrig and cabinet were. (10 years for the
cabinet).
We put the cabinet back. The
King measure the area for the new refrig. And the lower cabinet was great… but
the top one was very close. So now we
have to remove them and move them over. We have 2 inches to do so. Long story
short, we found out after removing everything, unscrewing the cabinet that now
refused to move.. we did NOT have to move the cabinet. So the King put it all back together.. I
looked and saw it was slanted.. slanted badly.. The King was so fed up with it
all, he was going to leave it. I told him no way.. and I would point it out to
all of his friends. So he decided to use
the level and sure enough (like my eyes were not good enough) it was way out of
line. After much cussing and
protesting.. we replaced it aback to where it belong. And then we reloaded it all, with pots and
pans and rolls of stuff… and coffee cups in the upper one with many things in
the larger part.. and large dishes and bowls on top.
By noon it was all done.
Everything.. well just about all, back to where it belongs. Floor washed…
We looked at each other and
said at the same time.. I AM TOO OLD FOR THIS SHIT…
Now to wait for Home Depot to
deliver on Thursday… and hope and pray they don’t postpone it. As we will be really sick and tired of going
out to the garage to get stuff out of the old refrig.
And as with all of our
projects, tempers raised, cusses were throw around, and yes, I earned my bitch
wings well.
NO, we were not arguing… we
were just pointing out our own opinions… of the project.. lol.. although a
bypasser might have thought there might be combat soon… lol